【Chongqing Jiangbei International Airport T3B Terminal Cold and Heat Source Main Engine Project】Spring Shock Absorber Contract
The official website of Shanghai Songjiang Shock Absorber Group Co., Ltd. will introduce to you: [Chongqing Jiangbei International Airport T3B Terminal Cold and Heat Source Main Engine Project] Spring Shock Absorber Contract Information, Shanghai Songjiang Group provides adjustable spring shock absorbers for many terminals and runway engineering cold and heat source host and computer room projects, which has the effect of noise reduction and shock absorption, and supplies pipeline shock absorber products for Beijing Daxing Airport. The following is an introduction to the contract information of spring shock absorbers for the spring shock absorber of the T3B terminal and the fourth runway project of Chongqing Jiangbei International Airport.
1. Chongqing Jiangbei International Airport T3B terminal and the fourth runway project cold and heat source host and computer room group control procurement project information introduction:
Chongqing Jiangbei International Airport T3B terminal and the fourth runway project cold and heat source host and computer room group control procurement project bidding announcement
1. Bidding conditions
The bidding project Chongqing Jiangbei International Airport T3B terminal and the fourth runway project has been approved by the National Development and Reform Commission with the National Development and Reform Commission [2020] No. 1721 document, the project owner is Chongqing Airport Group Co., Ltd., the construction funds come from the National Development and Reform Commission, the Civil Aviation Administration, the Chongqing Municipal People’s Government and Chongqing Airport Group Co., Ltd. self-raised, and the project owner is Chongqing Airport Group Co., Ltd. The project has met the bidding conditions, and is now open for bidding for the group control procurement project of the main engine and computer room of the cold and heat source of the T3B terminal and the fourth runway project of Chongqing Jiangbei International Airport.
2. Project Overview:
The construction of the T3B terminal in Chongqing Jiangbei International Airport, with a total construction area of about 360,000 square meters. Combined with the demand, load characteristics, site conditions, and the requirements of the “Public Building Energy Conservation (Green Building) Design Standard DBJ50-052-2020” for the application of renewable energy, the cold and heat source of the centralized air-conditioning system of this project adopts a composite system of centrifugal chiller and air-cooled heat pump screw unit. According to the heating demand, a total of 12 air source heat pump units are configured, which are located in the four corners of the outdoor landscape platform on the north and south sides of the L3 floor. At the same time, the air source heat pump unit is used as a cooling source for the centralized air-conditioning system, and the insufficient part of the total cooling capacity is made up by the water-cooled inverter centrifugal chiller, which has a total of 5 centrifugal chillers, which are located in the refrigeration machine room on the first floor. Under the background of the national promulgation of the “Energy and Resource Consumption Quota of the Central and State Organs”, “Guiding Opinions on Accelerating the Establishment and Improvement of a Green, Low-Carbon and Circular Development Economic System”, “Action Plan for Carbon Peaking Before 2030”, “Action Plan for Green and Efficient Refrigeration” and other documents, the project actively responds to national policies and guidelines, and aims to build energy-saving, environmentally friendly and low-carbon efficient computer rooms to promote the development of green airports.
2. [Chongqing Jiangbei International Airport T3B Terminal and Fourth Runway Project Cold and Heat Source Main Engine and Computer Room Group Control Procurement Project] Scanned copy of the spring shock absorber contract:
3. [Chongqing Jiangbei International Airport T3B Terminal and Fourth Runway Project Cold and Heat Source Main Engine and Machine Room Group Control Procurement Project] Spring Shock Absorber Contract Product Diagram: